Share capital increase to € 820 400.00.

 

Project, Construction and Installation of the Steam Generator System of the Fradelos Forest Biomass Power Plant.

 

 

Project and construction of the first Aquatubular Steam Boiler, Natural Gas, for installation at Caima  Indústria  de Celulose , SA

Capital increase to € 300 400.00

Transformation into Public Limited Company and change of company name to Energest – Engenharia e Sistemas Industriais, SA

Capital increase to € 150 200.00

2010
2008

Project, Construction and Installation of the BOP of Barreiro Cogeneration Plant

 

 

2000
1998
1990

Project, Construction and Installation of the first Recovery Boiler (HRSG), for the Covelas Cogeneration Plant.

 

Activity change for engineering, construction, manufacturing and assembly of eletrical and mechanical industrial equipment and installations.

 

1990
1987

Foundation of Energest- Engenharia, Equipamentos e Instalações Térmicas Industriais, Lda.